Skip to content
Established in 2008Cairo, Egypt
Flags of Arab countries
الاتحاد العربي لتنمية الموارد البشريةArab Union for Human Resources DevelopmentVisitor Register
Programme information

Achieving Production Quality Using Continuous Improvement Techniques

Programme reference: UHRDA-202608021

The programme focuses on planning quality control points across production stages and improving value flow and reducing waste.

Programme information reviewed:

Programme source and review scope

This reference links the page to the Union’s 2026 plan. Source table: 8 · row: 21.

The date above covers review of the programme information, source traceability and presentation of published information. It does not imply independent academic accreditation.

Archived dates

Information to help you decide

Dates
2026-04-26 - 2026-04-30
Location
Cairo — Arab Union for Human Resources Development headquarters
Programme fee
600 US dollars
Programme duration
One week
Delivery language
Arabic — English delivery is available by agreement
Attendance mode
In person
Training hours
25 training hours

These dates have passed. The Union will review your request for a new date.

What the programme fee includes

  • Training
  • Training materials
  • Certificate
  • Breaks between sessions
  • Lunch
  • Airport arrival and departure transfers

The advertised fee is the total amount payable by the participant. No additional fees are added.

Give the Union your airport, flight number and arrival and departure times to arrange transfers. Ask for the payment, cancellation, postponement and substitution terms in your written quotation before confirming.

Request an invoice or an approved quotation — Include the programme name or number in your request.

Certificate of completion for the programme, workshop or training course

Participants receive a certificate of completion for the programme, workshop or training course from the Arab Union for Human Resources Development. The certificate is awarded on the basis of attendance.

This programme is listed under Quality in the Management sector.

Programme brochure

Achieving Production Quality Using Continuous Improvement Techniques

Introduction

The programme “Achieving Production Quality Using Continuous Improvement Techniques” addresses linking product and process characteristics to inspection points, traceability, and nonconformity resolution. It links quality to a clear requirement, working method, measurement, evidence, and improvement, distinguishing system quality from output quality and the limits of inspection.

The exercises use a hypothetical process, data, and files. The participant prepares a production control plan, traceability register, inspection points, and remediation process and tests data quality, suitability of the tool, and clarity of responsibility before identifying matters requiring technical review or approval within the organization.

Learning objectives

  1. Linking product and process characteristics to inspection points, traceability, and nonconformity resolution.
  2. Analyzing a process flow and selecting an experiment that reduces waiting and rework without weakening quality.
  3. Developing a preliminary reading of a control chart that links data type, chronological sequence, and variation signals.
  4. Distinguishing symptoms from causes and testing problem hypotheses and evidence of action effectiveness.
  5. Organizing a Plan–Do–Check–Act cycle for a limited improvement experiment and its follow-up.

Learning areas

Learning area 1: Planning Quality Control Points Across Production Stages

  1. Read the requirements of a hypothetical product and identify critical characteristics, process stages, and inputs.
  2. Define the control point, method, owner, record, acceptance criterion, and when inspection requires a specialist.
  3. Organize batch identification and traceability of materials, versions, and changes, and examine supplier, equipment, and human effects.
  4. Establish a process for segregation, assessment, and referral, and prevent release of an unacceptable output without a decision by the authorized person.
  5. Review data on defects, rework, and stoppages and identify a documented improvement; exercises are simulations, not the operation of production equipment.

Learning area 2: Improving Value Flow and Reducing Waste

  1. Define value from the beneficiary's perspective and map process steps, working and waiting times, and handovers.
  2. List rework, transport, storage, unnecessary work, and interruptions and verify their causes.
  3. Compare workflow simplification, workplace organization, flow, and work-in-progress limit options within case constraints.
  4. Test a small change with those performing the work and monitor quality, time, workload, and side effects.
  5. Document the improved work method, training, and sustainability review without equating cost reduction alone with quality improvement.

Learning area 3: Monitoring Process Stability with Control Charts

  1. Define the process, data type, collection sequence, appropriate groupings, and purpose of monitoring variation.
  2. Select a suitable chart, reviewing assumptions and how limits are calculated using appropriate baseline data.
  3. Distinguish control limits derived from process performance from specification limits or management targets.
  4. Examine signals of change or special causes, verify their context, and document the investigation without changing limits to conceal a signal.
  5. Prepare a monitoring, response, and stability review plan using synthetic data before any specialist operational application.

Learning area 4: Root Cause Analysis and Verification of Corrective Action Effectiveness

  1. Describe the nonconformity in terms of what, where, when, and the scale of impact, and identify suitable containment within the relevant authority.
  2. Collect a sequence of events, data, and authorized work testimony, separating facts from conjecture.
  3. Use a cause diagram or why questions to develop hypotheses, avoiding the assumption that individual error is the only explanation.
  4. Test the hypothesis against evidence and link the action to the cause, identifying the owner, deadline, and potential side effects.
  5. Specify a follow-up measure and timing to verify prevention of recurrence, and reopen the analysis if the action’s impact is not demonstrated.

Learning area 5: Testing and Reviewing Improvements Through the PDCA Cycle

  1. Define the improvement opportunity, baseline, target, success measure, hypothesis, and change plan.
  2. Run a small experiment or simulation, retaining implementation data and deviations from the plan.
  3. Compare the result with expectations and analyze what the team learned, gaps, and unintended effects.
  4. Make an evidence-based decision to modify, repeat, or expand and update the procedure when the experiment succeeds.
  5. Define a new follow-up cycle, an improvement owner, and evidence of sustained improvement rather than treating one experiment as the end of the work.

Outputs

  1. A production control plan, traceability register, inspection points, and remediation process.
  2. A value stream map, waste list, and improvement and measurement plan.
  3. An educational control chart, signal verification register, and response plan.
  4. A problem, evidence, and hypothesis register and a corrective action verification plan.
  5. A PDCA cycle sheet, trial plan, result analysis, and follow-up decision.

Target participants

  1. Quality and improvement staff, process owners, and supervisors whose duties relate to the programme subject.
  2. Project, production, service, data, and review teams involved in defining requirements, measurement, and addressing gaps.
  3. Managers and improvement team coordinators supporting resource allocation and monitoring decisions and the effectiveness of actions.

Participation requirements

  1. Familiarity with a work process and basic quality and measurement concepts; the Union administration reviews the required level of experience and statistical or data skills according to the programme subject.
  2. Synthetic or authorized data is used. The competent body verifies the standard version, sector requirements, and suitability of methods before any actual implementation; the training does not confer operating authorization, conformity certification, or an external qualification.

Conclusion

The participant leaves with tools for applying “Achieving Production Quality Using Continuous Improvement Techniques”, led by a production control plan, traceability register, inspection points, and remediation process. The outputs link the requirement to evidence, measurement limits, the decision, the person responsible for corrective action, and the date for verifying impact, identifying gaps and matters requiring specialist review before implementation.

The delivery language, attendance format, services included in the fee and certificate arrangements are specified in the participation confirmation issued by the Union.

Request a new dateRequest a new programme dateArab Union for Human Resources Development
Program

Achieving Production Quality Using Continuous Improvement Techniques

Previous dates · for reference: - April 2026

These dates have passed. The Union will review your request for a new date.

7-15 digits; include the country code for international contact.

Applications are directed to the Union’s main email: [email protected]

The Union reviews your request and contacts you to confirm availability, dates and arrangements. Submission is not final confirmation of participation.

How Do We Use Your Data?

Submission is complete when a save confirmation and reference appear. The result explains the email notification status; saving a request or mail-server acceptance does not confirm inbox delivery. Submission does not confirm participation, pricing or a booking before the administration responds. The Union team will contact you to follow up.

Back to Quality programmes →