Preparing a Preliminary Oil Project Study: From Opportunity Assessment to the Investment Decision
Introduction
An oil project study starts with a testable question: which opportunity warrants further development effort, and what information is needed before making a greater commitment? Encouraging geological indications or positive market expectations alone do not create a sound decision case. Data quality interacts with development scope, infrastructure, contractual arrangements, delivery capacity, and environmental and operating obligations.
The programme treats the preliminary study as a stage for organising knowledge, comparing alternatives, and identifying gaps, rather than manufacturing certainty. Participants turn a project idea into a defined scope, assemble traceable specialist inputs, prepare estimates linked to explicit assumptions, and formulate a recommendation explaining whether to proceed, defer, or reject the opportunity and what each choice requires next.
The case study connects technical, commercial, and delivery considerations without replacing exploration, reservoir engineering, detailed design, or specialist legal and financial judgement. Participants use fictional training data and identify the owner, validity date, intended use, and interpretive limits of each input at this stage.
The aim is a reviewable case that allows a reader outside the study team to understand the alternatives considered, the assumptions that changed the result, and the remaining uncertainty. Particular attention is given to presenting the issue to a competent committee and separating the study team's recommendation from the organisation's actual approval authority.
The study approach can be applied to opportunities of different sizes, asset types, and maturity, such as connecting additional production to an existing facility or comparing initial development concepts. Each case identifies the comparison boundary, shared-service dependencies, and whether the decision concerns funding further study or redefining the project. This separates approval to learn more about an opportunity from approval to execute it, helping the team focus on decision-critical information rather than detail unnecessary for the current decision.
Objectives
- Formulate an initial opportunity definition that explains the need, expected value, and project boundaries, separating the problem to be addressed from the sponsor's preferred solution before alternatives are examined.
- Build an input register connecting technical, commercial, and operating information to its sources, owners, and completeness, identifying what needs verification before it supports a calculation or recommendation.
- Read production or resource estimates in the context of their assumptions and limits, referring specialist estimation and classification to qualified professionals rather than treating preliminary numbers as fixed investment facts.
- Prepare a consistent comparison of development, infrastructure, timing, and delivery-scope alternatives using common boundaries and assumptions, explaining why each option is screened out or retained for further study.
- Structure an initial economic model showing cash-flow sources, costs, and timing, with reviewable assumptions that prevent a single numerical result from concealing technical or contractual gaps.
- Test how selected assumptions affect the comparison of alternatives, distinguishing the effect of one variable from a coherent scenario in which several conditions change together.
- Identify study risks and obligations that could change project scope, timing, or deliverability, assigning an owner and a verification or review route before requesting a greater commitment.
- Draft a balanced decision memorandum with a conditional recommendation, supporting reasons, and alternatives, explaining study maturity, limitations, next-stage work, and internal follow-up and review responsibilities.
Programme topics
Learning area 1: Framing the opportunity and the preliminary study
- Identify whether the opportunity involves field development, a production tie-in, or improvement of an existing asset, describing the underlying need before proposing a spending scope.
- Define the problem, required outcome, and principal constraints, separating the objectives of the preliminary study from those of project delivery so that the study does not promise more than the available information supports.
- Map project boundaries and interfaces with facilities, pipelines, power, and services, identifying what is included in the comparison and what is an external assumption requiring specialist review.
- Distinguish stakeholders, data owners, and decision authorities; identify their questions and acceptance criteria for the study, recording conflicting priorities rather than hiding them behind broad wording.
- Develop an initial alternatives tree, including the status quo where relevant, distinguishing deferral, scope redefinition, and continued evaluation rather than presenting a single project as a simple accept-or-reject choice.
- Prepare a concise study charter defining scope, deliverables, responsibilities, required resources, and review points, then test its clarity in a case where the business and technical teams define the opportunity differently.
Learning area 2: Technical inputs, data quality, and traceability
- Inventory available geological, reservoir, and production information, recording each source, date, and original purpose without automatically assuming that information prepared for a previous use is fit for the current study.
- Organise an assumptions register that separates measurements, estimates, and interpretations, identifies the approver for each input, and explains how conflicting sources or missing support will be handled.
- Discuss resource and reserve classifications at the level needed to understand inputs and project maturity, documenting the role of qualified specialists without presenting this training as qualification to issue reserve estimates or certified technical reports.
- Read production profiles provided by specialists, identifying assumptions about ramp-up, downtime, processing capacity, and facility interfaces, and the missing information that could change development scope or timing.
- Convert data gaps into a verification plan prioritised by decision impact, defining an acceptable outcome for each activity rather than collecting extensive information requests with no clear role in comparing alternatives.
- Audit a fictional data pack containing a conflicting number, an unclear date, and an unsupported assumption; prepare a query log recording impact, owner, and the response needed before the next version is approved.
Learning area 3: Development alternatives, cost scope, and deliverability
- Define comparable development alternatives at preliminary-study level, identifying differences in production, processing, tie-ins, and services while leaving detailed engineering choices to the responsible specialist teams.
- Build an initial cost structure covering investment, operation, support, and closure stages as relevant to the case, recording estimate boundaries, source, date, exclusions, and unaddressed obligations.
- Distinguish a cost estimate from a supplier quotation or contractual commitment, connecting estimate detail to scope maturity and avoiding a presentation of precision unsupported by the available inputs.
- Review dependencies on existing facilities, power, logistics, and local capacity, identifying assumptions requiring approval or further study rather than treating service or capacity availability as established.
- Prepare an initial delivery sequence showing controlling activities, dependencies, decision points, and case-relevant regulatory obligations, separating a preliminary planning schedule from an approved execution date.
- Compare two options with different initial costs, infrastructure dependencies, and future flexibility, documenting why an option is preferred or rejected so that the comparison can be revisited when an assumption changes.
Learning area 4: The economic model, scenarios, and interpretive limits
- Define the evaluation perspective, time horizon, units, currency, and price basis, making assumptions about prices, costs, timing, and obligations visible for specialist review before results are interpreted.
- Structure initial cash flows around production, expenditure, and operating information accepted for the study, separating inputs, calculations, and outputs so that assumption changes remain traceable without rebuilding the file.
- Interpret the organisation's evaluation measures within their assumptions and limits, discussing why alternative rankings may change with the comparison criterion without treating a positive result as investment authority or a return guarantee.
- Run sensitivity tests for explicit inputs such as start timing, expenditure, or a fictional price case, stating which variables remain fixed so that a result is not attributed to an untested cause.
- Build coherent scenarios linking technical, commercial, and delivery changes where the case requires them; compare effects on option viability and staged funding needs while highlighting what remains unknown after the calculations.
- Prepare a results page comparing assumptions and ranges rather than isolated numbers, explaining the main drivers, reliance limits, and questions the preliminary model cannot answer without additional information or specialist studies.
Learning area 5: Risks, the decision memorandum, and next-stage planning
- Build an initial risk register covering relevant technical, commercial, delivery, environmental, and contractual issues; distinguish risks, assumptions, and existing problems and identify who owns follow-up or requests specialist advice.
- Connect high-impact issues to practical study actions such as obtaining information, reviewing an option, or deferring a commitment, without turning the brochure or classroom exercise into site safety procedures or operating instructions.
- Formulate a recommendation that distinguishes an opportunity's attractiveness from its readiness for the next stage, stating continuation conditions, the approval sought, and findings that could justify reconsideration before more resources are committed.
- Prepare a decision memorandum covering the opportunity, alternatives, comparison method, findings, limitations, and any dissenting view, with concise appendices that allow numbers and sources to be checked without obscuring the controlling issues.
- Build a next-stage plan covering verification questions, specialist work, deliverables, responsibilities, completion criteria, and review points, linking effort to what could actually change the organisation's decision rather than the size of the report.
- Present the study to a training panel representing business, technical, financial, and operating perspectives; record objections, responses, and required changes, then issue a revision showing changes, open items, and ownership before an institutional decision.
Outputs
- A preliminary-study charter defining the opportunity, boundaries, alternatives, decision questions, and responsibilities, providing a starting point for coordination between business and technical teams before the study expands or is redefined.
- An input, assumption, and source register distinguishing available information, estimates, and unverified material, recording each gap's impact and owner and providing a query list traceable across study versions.
- A development-alternatives matrix showing scope, infrastructure dependencies, initial costs, and screening decisions, with the common assumptions that make the comparison understandable and reviewable.
- An initial training economic model with separate inputs, calculations, and outputs and a record of units, price basis, estimate boundaries, and matters requiring specialist financial or contractual review.
- A defined sensitivity and scenario pack explaining changes in alternative rankings, limiting conclusions to the cases actually tested, and linking findings to next-stage verification questions.
- A risk and decision-issue register assigning owners and appropriate study or verification actions and showing potential effects on scope, timing, or additional review and approval needs.
- A conditional recommendation memorandum covering rationale, alternatives, limits, and pre-commitment requirements, with an executive summary, source appendices, and a clear presentation of professional disagreement beyond a single numerical result.
- A next-stage plan and review log defining required work, owners, and completion criteria, alongside a revised study reflecting panel feedback and separating completed work from open issues.
Who should attend
- Oil and gas project planning and development engineers who prepare or review initial inputs and need to connect technical information with the decision question, study boundaries, and alternatives.
- Oil and gas economics and opportunity analysts working in multidisciplinary teams who want better traceability of assumptions and scenarios and clearer presentation of study results to internal stakeholders.
- Project managers, business owners, portfolio staff, and technical reviewers responsible for stage-decision packs or for checking study completeness and comparison quality before referral to the authorised decision maker.
- Operations, facilities, contracting, and finance staff contributing specialist study inputs. Suitability is reviewed against role and experience; participants are not expected to hold expertise in every discipline.
Participation requirements and delivery methodology
- Participation assumes basic professional familiarity with oil and gas or project studies and practical ability to read tables and comparisons. Preparation needs are reviewed before delivery so that the programme is not confused with specialist foundation training outside its scope.
- A progressive case develops from an opportunity brief into a decision pack. Groups represent business, technical, economic, and delivery roles and document what they know, assume, and need to verify.
- Exercises use fictional or public data prepared for training. Confidential reservoir, reserve, contractual, or actual cost information is not requested. For a tailored case, the organisation defines permitted information and handling boundaries beforehand.
- Each group is reviewed for question clarity, scope consistency, input traceability, fair comparison, and explicit interpretive limits, with specific feedback that can be converted into changes in the next version.
- Practice includes reviewable tables and models using suitable office tools. The programme does not require purchase of a particular commercial package or grant an engineering licence; tools and equipment are agreed when delivery is arranged.
- Work is distributed across the programme to create a deliverable for each stage and integrate them into a final pack, with peer review, presentation, questioning, and recorded revisions alongside conceptual input.
- Petroleum resource management, cost-estimating, and alternatives-analysis references inform terminology. Material is selected for preliminary-study level and does not represent programme accreditation or replace institutional and competent-authority requirements.
- The programme concludes with a practical review of the study pack, rather than authorisation of an actual investment. Approval of estimates, design, funding, contracts, and project commitments remains with the relevant authorities under their applicable rules and procedures.
Conclusion
The intended result is an approach transferable to other opportunities: define a clear question, assemble traceable inputs, compare alternatives fairly, interpret results through their assumptions, and request a decision proportionate to knowledge maturity. The final pack contains a debatable recommendation, not a return promise or a substitute for specialist studies required for a real project.
After training, participants adapt the templates to their organisation's governance, asset characteristics, available data, and stakeholder requirements. Application value lies in identifying what the team must learn or verify before the next commitment and in making selection reasons, responsibilities, and open issues clear to reviewers and approvers.