Risk management of quantitative models and sensitive decision tables
Introduction
The programme “Risk management of quantitative models and sensitive decision tables” focuses on a specific practical need within Corporate Governance, Authority and Accountability. The course begins with Inventory of models and decisions relied upon and its exercises progress through to Preparation of a conditional acceptance or rejection report and alternative procedures.
The participant works on a training case linked to the subject of the programme for the production of: a register of models and classification of relevance and a verification, control and cessation protocol. Alternatives, limitations and decision guides are reviewed and the results are then adapted to the authority and policies of the entity before they are applied.
Objectives
By the end of the programme, participants work towards the following in a practical case:
- Inventory of models and decisions relied upon
- Examination of assumptions, data quality and application limits
- Independent audit and performance test outside the sample
- Change control, abuse and control design
- Preparation of a conditional acceptance or rejection report and alternative procedures
Programme topics
Day 1: Inventory of models and decisions relied upon
- The decision required shall be distinguished from the missing information and the authority to adopt it.
- Comparison of alternatives and recording of justification and responsibility and subsequent review of the decision.
Day 2: Examination of assumptions, data quality and application limits
- Check completeness, consistency and the suitability of the sample for the analysis, using training data.
- Record assumptions and limits of inference and review inconsistent values before use.
Day 3: Independent audit and performance test outside the sample
A practical exercise tailored to this day’s topic: Independent audit and performance test outside the sample.
Day 4: Change control, abuse and control design
A practical exercise tailored to this day’s topic: Change control, abuse and control design.
Day 5: Preparation of a conditional acceptance or rejection report and alternative procedures
- You track the entrance, the exit, the owner of the step, the waiting time and the delivery point to the next party.
- A short or an exception test and a method for its reinstatement without losing its documentary effect.
Outputs
- Record of models and classification of relevance and verification protocol, control and cessation
- A documented practical portfolio covering the programme topics, including decisions, evidence and limitations of use.
- A workplace transfer plan identifying the person responsible for the next step, a trial date and a criterion for verifying the outcome.
Who should attend
- Independent verification teams and forecasting and accounting models owners
- Team members assigned to prepare or review the outputs specified in the programme topics, according to their experience and roles.
Participation requirements and delivery methodology
- Experience or a work assignment related to Corporate Governance, Authority and Accountability, with programme suitability reviewed with the Training Department.
- Hypothetical data and cases are used. Disclosure of personal data or confidential documents is not required.
- Exercises, practical cases, discussion of alternatives and review of the practical output, based on each training day’s topic.
- The output is assessed for completeness, fitness for purpose and practicality. Specialist aspects are reviewed by authorized professionals.
Conclusion
The programme concludes with presentation and review of the practical output and a link between the next step and the participant’s workplace. The focus is on Preparation of a conditional acceptance or rejection report and alternative procedures and documenting what requires amendment or approval before actual implementation.
