Design integrity controls and fraud prevention in the contracting cycle
Introduction
The programme “Design integrity controls and fraud prevention in the contracting cycle” focuses on a specific practical need within Corporate Governance, Authority and Accountability. The course begins with Drawing of the contractual cycle, leverage and circumvention and its exercises progress through to Submission of a prevention plan, referral and follow-up treatment.
The participant works on a training case linked to the subject matter of the programme to produce: a risk map of fraud, controls, warning flags and audit references through the contract cycle. Alternatives, limitations and decision guides are reviewed and the results are then adapted to the authority and policies of the entity before they are applied.
Objectives
By the end of the programme, participants work towards the following in a practical case:
- Drawing of the contractual cycle, leverage and circumvention
- Analysis of the scenarios of collusion, manipulation and outstanding invoices
- Design of segregation of duties, disclosure and verification evidence
- Test alarms for training cases without assuming conviction
- Submission of a prevention plan, referral and follow-up treatment
Programme topics
Day 1: Drawing of the contractual cycle, leverage and circumvention
- Conversion of the requirement to verifiable outputs, acceptance criteria and follow-up evidence.
- Document the deviation, the decision to process and the follow-up officer in accordance with the authorized authority and authority.
Day 2: Analysis of the scenarios of collusion, manipulation and outstanding invoices
- Link each priority to an outcome, responsibility, date, implications and resources required for implementation.
- Comparison of implementation alternatives and testing of the impact of a change in a scenario on sequencing and resources.
Day 3: Design of segregation of duties, disclosure and verification evidence
A practical exercise tailored to this day’s topic: Design of segregation of duties, disclosure and verification evidence.
Day 4: Test alarms for training cases without assuming conviction
- Linking the need to a job assignment, to a detectable behaviour and to a criterion for proof of proficiency.
- Designing an application activity, feedback and follow-up on learning transition to work.
Day 5: Submission of a prevention plan, referral and follow-up treatment
- You track the entrance, the exit, the owner of the step, the waiting time and the delivery point to the next party.
- A short or an exception test and a method for its reinstatement without losing its documentary effect.
Outputs
- Fraud risk map, controls, warning flags and cross-references
- A documented practical portfolio covering the programme topics, including decisions, evidence and limitations of use.
- A workplace transfer plan identifying the person responsible for the next step, a trial date and a criterion for verifying the outcome.
Who should attend
- Directors of integrity, control, procurement and contract owners
- Team members assigned to prepare or review the outputs specified in the programme topics, according to their experience and roles.
Participation requirements and delivery methodology
- Experience or a work assignment related to Corporate Governance, Authority and Accountability, with programme suitability reviewed with the Training Department.
- Hypothetical data and cases are used. Disclosure of personal data or confidential documents is not required.
- Exercises, practical cases, discussion of alternatives and review of the practical output, based on each training day’s topic.
- The output is assessed for completeness, fitness for purpose and practicality. Specialist aspects are reviewed by authorized professionals.
Conclusion
The programme concludes with presentation and review of the practical output and a link between the next step and the participant’s workplace. The focus is on Submission of a prevention plan, referral and follow-up treatment and documenting what requires amendment or approval before actual implementation.
