The governance of artificial intelligence systems and their accountability through the life cycle
Introduction
The programme “The governance of artificial intelligence systems and their accountability through the life cycle” focuses on a specific practical need within Corporate Governance, Authority and Accountability. The course begins with Inventory of affected uses, Parties and decisions and its exercises progress through to Simulation of the decline in the performance of the system, responsibility and procedure.
The participant works on a training case linked to the subject of the programme to produce: a regulatory framework that includes the record of regulations, risk classification, approval and control gates and human interception. Alternatives, limitations and decision guides are reviewed and the results are then adapted to the authority and policies of the entity before they are applied.
Objectives
By the end of the programme, participants work towards the following in a practical case:
- Inventory of affected uses, Parties and decisions
- Assessment of data risk, accuracy, fairness and privacy
- Design of accreditation, verification and human responsibility gates
- Control of disclosure, interception, control, change and suspension
- Simulation of the decline in the performance of the system, responsibility and procedure
Programme topics
Day 1: Inventory of affected uses, Parties and decisions
- The decision required shall be distinguished from the missing information and the authority to adopt it.
- Comparison of alternatives and recording of justification and responsibility and subsequent review of the decision.
Day 2: Assessment of data risk, accuracy, fairness and privacy
- Check completeness, consistency and the suitability of the sample for the analysis, using training data.
- Record assumptions and limits of inference and review inconsistent values before use.
Day 3: Design of accreditation, verification and human responsibility gates
A practical exercise tailored to this day’s topic: Design of accreditation, verification and human responsibility gates.
Day 4: Control of disclosure, interception, control, change and suspension
A practical exercise tailored to this day’s topic: Control of disclosure, interception, control, change and suspension.
Day 5: Simulation of the decline in the performance of the system, responsibility and procedure
- You track the entrance, the exit, the owner of the step, the waiting time and the delivery point to the next party.
- A short or an exception test and a method for its reinstatement without losing its documentary effect.
Outputs
- Control framework containing the system log, risk classification, approval and control gates and human interception
- A documented practical portfolio covering the programme topics, including decisions, evidence and limitations of use.
- A workplace transfer plan identifying the person responsible for the next step, a trial date and a criterion for verifying the outcome.
Who should attend
- Governance and risk managers and smart system owners and auditors
- Team members assigned to prepare or review the outputs specified in the programme topics, according to their experience and roles.
Participation requirements and delivery methodology
- Experience or a work assignment related to Corporate Governance, Authority and Accountability, with programme suitability reviewed with the Training Department.
- Hypothetical data and cases are used. Disclosure of personal data or confidential documents is not required.
- Exercises, practical cases, discussion of alternatives and review of the practical output, based on each training day’s topic.
- The output is assessed for completeness, fitness for purpose and practicality. Specialist aspects are reviewed by authorized professionals.
Conclusion
The programme concludes with presentation and review of the practical output and a link between the next step and the participant’s workplace. The focus is on Simulation of the decline in the performance of the system, responsibility and procedure and documenting what requires amendment or approval before actual implementation.
