Transfer of government regulations to the cloud while maintaining continuity of service
Introduction
The programme “Transfer of government regulations to the cloud while maintaining continuity of service” focuses on a specific practical need within Digital Transformation Management and Business Process Redesign. The course begins with Classification of systems and data for transfer and its exercises progress through to Preparation of operational acceptance and cost control plan and service.
Participants work on a training case related to the programme topic to produce a practical portfolio covering the results of: Classification of systems and data for transfer ; Evaluation of service dependency and host controls ; Design of transport, recovery and business continuity phases ; Performance testing and post-transfer data verification ; Preparation of operational acceptance and cost control plan and service. Alternatives, constraints and decision evidence are reviewed. The results are then adapted to the organization’s authority arrangements and policies before implementation.
Objectives
By the end of the programme, participants work towards the following in a practical case:
- Classification of systems and data for transfer
- Evaluation of service dependency and host controls
- Design of transport, recovery and business continuity phases
- Performance testing and post-transfer data verification
- Preparation of operational acceptance and cost control plan and service
Programme topics
Day 1: Classification of systems and data for transfer
- Check completeness, consistency and the suitability of the sample for the analysis, using training data.
- Record assumptions and limits of inference and review inconsistent values before use.
Day 2: Evaluation of service dependency and host controls
- Identify process requirements, terms of reference and data before selecting or developing the tool.
- Testing the success of the mission, failures, re-entry and human intervention in a training environment.
Day 3: Design of transport, recovery and business continuity phases
- Link each priority to an outcome, responsibility, date, implications and resources required for implementation.
- Comparison of implementation alternatives and testing of the impact of a change in a scenario on sequencing and resources.
Day 4: Performance testing and post-transfer data verification
A practical exercise tailored to this day’s topic: Performance testing and post-transfer data verification.
Day 5: Preparation of operational acceptance and cost control plan and service
- Identification of cost elements, resources, assumptions and source of each estimate before comparison.
- Testing the change in workload or resources and indicating its impact on the alternative and recommendation.
Outputs
- A practical portfolio covering the results of: Classification of systems and data for transfer ; Evaluation of service dependency and host controls ; Design of transport, recovery and business continuity phases ; Performance testing and post-transfer data verification ; Preparation of operational acceptance and cost control plan and service.
- A documented practical portfolio covering the programme topics, including decisions, evidence and limitations of use.
- A workplace transfer plan identifying the person responsible for the next step, a trial date and a criterion for verifying the outcome.
Who should attend
- Government service owners, operating managers, digital transformation and focal points working with technical specialists
- Team members assigned to prepare or review the outputs specified in the programme topics, according to their experience and roles.
Participation requirements and delivery methodology
- Experience or a work assignment related to Digital Transformation Management and Business Process Redesign, with programme suitability reviewed with the Training Department.
- Hypothetical data and cases are used. Disclosure of personal data or confidential documents is not required.
- Exercises, practical cases, discussion of alternatives and review of the practical output, based on each training day’s topic.
- The output is assessed for completeness, fitness for purpose and practicality. Specialist aspects are reviewed by authorized professionals.
Conclusion
The programme concludes with presentation and review of the practical output and a link between the next step and the participant’s workplace. The focus is on Preparation of operational acceptance and cost control plan and service and documenting what requires amendment or approval before actual implementation.
