Building a flexible government technical structure that supports expansion and modernization of services
Introduction
The programme “Building a flexible government technical structure that supports expansion and modernization of services” focuses on a specific practical need within Digital Transformation Management and Business Process Redesign. The course begins with Identification of expansion and continuity needs and its exercises progress through to Audit of the design of an expanded and updated structure.
Participants work on a training case related to the programme topic to produce a practical portfolio covering the results of: Identification of expansion and continuity needs ; Drawing critical structure and dependency components ; Comparison of options for flexibility, availability and integration ; Capacity and control limits and change management ; Audit of the design of an expanded and updated structure. Alternatives, constraints and decision evidence are reviewed. The results are then adapted to the organization’s authority arrangements and policies before implementation.
Objectives
By the end of the programme, participants work towards the following in a practical case:
- Identification of expansion and continuity needs
- Drawing critical structure and dependency components
- Comparison of options for flexibility, availability and integration
- Capacity and control limits and change management
- Audit of the design of an expanded and updated structure
Programme topics
Day 1: Identification of expansion and continuity needs
A practical exercise tailored to this day’s topic: Identification of expansion and continuity needs.
Day 2: Drawing critical structure and dependency components
- Identification of the scenario, its causes and impact, and the officer in office and the responsibility for reviewing them.
- Testing of a processing officer, a follow-up indicator and a standard for the escalation of residual risks.
Day 3: Comparison of options for flexibility, availability and integration
A practical exercise tailored to this day’s topic: Comparison of options for flexibility, availability and integration.
Day 4: Capacity and control limits and change management
A practical exercise tailored to this day’s topic: Capacity and control limits and change management.
Day 5: Audit of the design of an expanded and updated structure
A practical exercise tailored to this day’s topic: Audit of the design of an expanded and updated structure.
Outputs
- A practical portfolio covering the results of: Identification of expansion and continuity needs ; Drawing critical structure and dependency components ; Comparison of options for flexibility, availability and integration ; Capacity and control limits and change management ; Audit of the design of an expanded and updated structure.
- A documented practical portfolio covering the programme topics, including decisions, evidence and limitations of use.
- A workplace transfer plan identifying the person responsible for the next step, a trial date and a criterion for verifying the outcome.
Who should attend
- Government service owners, operating managers, digital transformation and focal points working with technical specialists
- Team members assigned to prepare or review the outputs specified in the programme topics, according to their experience and roles.
Participation requirements and delivery methodology
- Experience or a work assignment related to Digital Transformation Management and Business Process Redesign, with programme suitability reviewed with the Training Department.
- Hypothetical data and cases are used. Disclosure of personal data or confidential documents is not required.
- Exercises, practical cases, discussion of alternatives and review of the practical output, based on each training day’s topic.
- The output is assessed for completeness, fitness for purpose and practicality. Specialist aspects are reviewed by authorized professionals.
Conclusion
The programme concludes with presentation and review of the practical output and a link between the next step and the participant’s workplace. The focus is on Audit of the design of an expanded and updated structure and documenting what requires amendment or approval before actual implementation.
