Planning for technical intergenerational transition and protection of competitiveness
Introduction
The programme “Planning for technical intergenerational transition and protection of competitiveness” focuses on a specific practical need within Strategy, Planning and Organizational Performance. The course begins with Designing value-control techniques and their expected age and its exercises progress through to Submission of a conditional replacement map of indicators and decision portals.
The participant works on a training case linked to the programme theme to produce: a technical transition map linking the age of capabilities, alternatives, replacement windows and the barriers to delay. Alternatives, limitations and decision guides are reviewed and the results are then adapted to the authority and policies of the entity before they are applied.
Objectives
By the end of the programme, participants work towards the following in a practical case:
- Designing value-control techniques and their expected age
- Assessment of alternatives, indicators of maturity and performance limits
- Analysis of reliance on existing assets, skills and standards
- Comparison of early adoption, waiting and double transition
- Submission of a conditional replacement map of indicators and decision portals
Programme topics
Day 1: Designing value-control techniques and their expected age
A practical exercise tailored to this day’s topic: Designing value-control techniques and their expected age.
Day 2: Assessment of alternatives, indicators of maturity and performance limits
- A measure is defined by data source, baseline, periodic update and responsible clear verification.
- Compare the outcome with the target and examine the quality of the manual before selecting a corrective action.
Day 3: Analysis of reliance on existing assets, skills and standards
- Definition of conduct or mission and performance evidence that characterizes the level of mastery required.
- Compare the current level with the target and identify learning or support and verify improvement.
Day 4: Comparison of early adoption, waiting and double transition
A practical exercise tailored to this day’s topic: Comparison of early adoption, waiting and double transition.
Day 5: Submission of a conditional replacement map of indicators and decision portals
- The decision required shall be distinguished from the missing information and the authority to adopt it.
- Comparison of alternatives and recording of justification and responsibility and subsequent review of the decision.
Outputs
- Technical transition map linking age of capacity, alternatives, replacement windows and prevention of delay
- A documented practical portfolio covering the programme topics, including decisions, evidence and limitations of use.
- A workplace transfer plan identifying the person responsible for the next step, a trial date and a criterion for verifying the outcome.
Who should attend
- Strategy, technical, research and development managers
- Team members assigned to prepare or review the outputs specified in the programme topics, according to their experience and roles.
Participation requirements and delivery methodology
- Experience or a work assignment related to Strategy, Planning and Organizational Performance, with programme suitability reviewed with the Training Department.
- Hypothetical data and cases are used. Disclosure of personal data or confidential documents is not required.
- Exercises, practical cases, discussion of alternatives and review of the practical output, based on each training day’s topic.
- The output is assessed for completeness, fitness for purpose and practicality. Specialist aspects are reviewed by authorized professionals.
Conclusion
The programme concludes with presentation and review of the practical output and a link between the next step and the participant’s workplace. The focus is on Submission of a conditional replacement map of indicators and decision portals and documenting what requires amendment or approval before actual implementation.
